Freight Operations
Coverage of both private and BW workings, not neccesarily always of actual operations
Freight & Canal Operations (2001)
All pictures on this page are from 2001

The event event went totally unrecorded in October 2001. It wasnt 100% certain that Beauchamp (whose public launch was that very day at Little Venice)
would get through Maida Hill tunnel. Whilst Beauchamp's dignitaries were attending her launch at Little Venice, contractors, overseen by BW, were building this makeshift tunnel profile measuring boat for the purpose of mimicking Beauchamp's profile and making sure that she could safely navigate Maida Hill tunnel

Steve and Peter from BW wait with Python, in readiness for towing the tunnel profile barge through Maida Hill

Another view of the tunnel profile barge whilst Jasons passes by on the return leg of a trip to Camden

This tug was seen approaching Limehouse Basin. It was overseeing works during October 2001 at Limehouse adjacent to the Docklands railway bridge
Years covered in this feature:
2001 2002 2003 2004 2005 2006 2007 2008